home

Acquisition of a Royalty on the Cañariaco Copper Project - Anglo Pacific Group

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014 (as amended)
Anglo Pacific Group PLC (“Anglo Pacific”, the “Company”) (LSE: APF, TSX: APY) is pleased to announce that it has entered into an agreement with Entrée Resources Ltd., (“Entrée”) to acquire an existing 0.5% Net Smelter Return Royalty (the “Royalty”) over the Cañariaco Copper Project (the “Cañariaco Project”) in Peru, which is 100% owned by Candente Copper Corp. (“Candente”), a Toronto Stock Exchange (“TSX”) listed company.
Anglo Pacific will provide Entrée with US$1 million (~£0.75 million) as consideration for the Royalty, payable in Anglo Pacific shares at transaction close.
Highlights of the transaction: 

  • Attractive copper demand outlook
  • Sizable Cañariaco Norte resource base:
    • NI 43-101 M&I Resource of 7.5 billion pounds of contained copper; and,
    • Projected life of mine average production of 262 million pounds of copper per annum. (1)
  • Long mine life – Cañariaco Norte estimated mine life of 22 years with extension potential; (1)
  • Substantial upside – Cañariaco Sur and Quebrada Verde integration potential;
  • Expected to be a low-cost operation, no firm timeline for development as yet; (1)
  • Established mining jurisdiction – located in an area of Peru with producing mines and projects owned by Gold Fields Ltd., Newmont Mining Corp., Rio Tinto Plc, and Southern Copper Corp. amongst others; and,
  • Further diversifies Anglo Pacific’s development stage royalty portfolio mix.

Located in Peru, the Cañariaco Project covers an extensive porphyry complex which includes the Cañariaco Norte, Cañariaco Sur, and Quebrada Verde porphyry deposits. The Cañariaco Sur and Quebrada Verde deposits are located in close proximity to Cañariaco Norte, and potentially allow for a larger integrated operation with shared facilities and infrastructure. The Royalty area covers the Cañariaco Project in its entirety.
Candente has prepared, in compliance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”), the Cañariaco Project, Lambayeque Department, Peru, NI 43-101 Technical Report on Pre-feasibility Study Progress Report (dated with an effective date of January 18, 2011) setting out Measured and Indicated Resources for Cañariaco Norte of 7.5 billion pounds of contained copper, and Inferred Resources of 1.4 billion pounds of contained copper. Life-of-mine average metal production is estimated at 262 million pounds of copper per annum (119,000 tonnes), 37,000 ounces of gold per annum, and 850,000 ounces of silver per annum over a 22-year mine life. Production costs are estimated at US$0.99 per pound of copper including by-product credits.
The acquisition is in line with the Company’s strategy to invest smaller amounts in development stage opportunities which have the potential for higher returns along with significant growth potential. Such development royalties complement the Company’s existing portfolio of income producing assets by enhancing longer-term optionality. The Company’s primary focus will continue to be acquiring royalties and streams on projects that are currently cash flow generating or are expected to be in the next 24 months.
Commenting on the investment, Julian Treger, Chief Executive Officer of Anglo Pacific Group, said:
“The Cañariaco Royalty reflects the Company’s increased focus on commodities which we believe will be vital in the delivery of new technology and innovation. This copper royalty supplements our Maracás Menchen vanadium royalty and our recently announced Piauí nickel-cobalt royalty, providing the Company with considerable exposure, and upside, to base materials which have a huge part to play in the energy storage and electric vehicle revolution.
“It is predicted that in the coming years declining copper grades at existing operations and the lack of recent investment into copper production capacity will lead to a supply deficit based on industrial demand sources alone. The incremental copper demand, driven by electric vehicle sales growth forecasts, creates conditions for an even tighter supply environment.
“We believe new copper supply will be required, and with a NI 43-101 compliant Measured and Indicated Resources of over 7.5 billion pounds of contained copper, the Cañariaco Project ranks as one of the largest independently owned, undeveloped copper projects. The Project’s additional exploration upside, low-cost potential and location in an established mining jurisdiction indicates a positive prospect for development during the next decade.
“As part of our due diligence process when looking at new opportunities we assess the sustainability, environmental impact and social affects a project might have. We are pleased to see that in the past Candente has had regular communication with various community members, as well as social and sustainable development projects with local and international Non–Governmental Organisations with the objective of improving the lives of families in under-developed regions. They have also worked in partnership with local community leaders and the Ministry of Economy and Finance of Peru to secure central government investment in sanitation, potable water, irrigation and transportation infrastructure and educational services.
“Longer-term, the Cañariaco Project has the potential to provide economic benefits in the form of direct, full time, life of mine employment for approximately 600 people, as well as 2,000 people during construction, and in addition the potential to create indirect life of mine indirect employment for an additional 2,400 people over a 20 year mine-life.”
Transaction Structure
Anglo Pacific will provide Entrée with US$1 million (~£0.75 million) consideration at transaction close, payable by the issue of 478,951 Anglo Pacific shares at the Anglo Pacific 30-day volume weighted average price of GBp 156.61 per share as of 4 June 2018 (the “Share Consideration”). Entrée has agreed to hold the Share Consideration for a period of at least 90 days following the closing of the transaction.
Entrée will have the right to a portion of any future royalty income received by Anglo Pacific in relation to the Royalty as follows:

  • 20% of any royalty payment received for any calendar quarter up to and including the quarter ending December 31, 2029;
  • 15% of any royalty payment received for any calendar quarter commencing January 1, 2030 up to and including the quarter ending December 31, 2034; and
  • 10% of any royalty payment received for any calendar quarter commencing January 1, 2035 up to and including the quarter ending December 31, 2039.

Cañariaco Project Overview (1)
The Cañariaco Project, 100% owned by TSX listed Candente Copper Corp., is a porphyry copper deposit within a prolific trend of producing mines and known deposits in northern Peru. Cañariaco Norte, Cañariaco Sur and a third target, Quebrada Verde, are part of an extensive porphyry complex covering a minimum length of five kilometres and an average width of two kilometres.
 Cañariaco Norte
Since 2004, Candente has drilled more than 72,000 meters in over 240 drill holes to define a NI 43-101 Resource for Cañariaco Norte. A Pre-Feasibility Study Progress Report was completed in January 2011 by AMEC.

Resources Category Tonnes
(Mt)
Cu grade
(%)
Au grade
(g/t)
Ag grade
(g/t)
Contained Cu
(Bn lbs)
Measured 338.1 0.48 0.08 2.0 3.588
Indicated 414.3 0.43 0.06 1.7 3.945
Measured & Indicated 752.4 0.45 0.07 1.8 7.533
Inferred 157.7 0.41 0.06 1.7 1.433

Note:   Mineral Resources at a 0.3% Cu cut-off grade.
Mining will occur as a conventional open pit extraction. The processing methodology will apply conventional technology and equipment commonly used in large copper mines throughout the global mining industry. The process includes crushing and grinding for size reduction followed by three stages of flotation with a concentrate regrinding stage to extract and recover copper, gold and silver. The process produces a concentrate containing primarily copper, with smaller amounts of gold and silver. Cañariaco Norte also contains arsenic which would report to the copper concentrate. As arsenic is a deleterious element for concentrate smelting, the Cañariaco Norte process envisages including a concentrate partial roast stage to remove arsenic from the concentrate copper. The partial roast stage will produce sulfuric acid, a marketable by-product.
The mine plan results in a total of 713.5 million tonnes of waste and 728.2 million tonnes of mill feed over a 22-year mine life (0.98:1 strip ratio). Average life-of-mine head grades to the process plant will be 0.40 percent copper, 0.067 grams per tonne gold and 1.71 grams per tonne silver. The mine grades during the first three years of production will be higher, with average feed grades of 0.48 percent copper, 0.086 grams per tonne gold and 2.14 grams per tonne silver. Life-of-mine average metal production is estimated at 262 million pounds of copper per annum (119,000 tonnes), 37,000 ounces of gold per annum, and 850,000 ounces of silver per annum. Average operating costs are estimated at US$0.99 per pound of copper including by-product credits.
Life-of-mine capital cost including sustaining capital and closure costs is estimated at US$1.6 billion, with an estimated capital cost to achieve production of US$1.4 billion.
Cañariaco Norte is estimated to have a pre-tax NPV8 and pre-tax IRR of US$2.0 billion and 26.8% respectively, assuming life-of-mine average commodity prices of US$2.38 per pound of copper (~US$5,238 per tonne), US$16.97 per ounce of silver, and US$1,047 per ounce of gold.
In April 2011, Candente initiated a Feasibility Study (“FS“) of the Cañariaco Norte Project. In mid-2013, although well advanced and approximately 50% complete, the FS was put on hold due to the deterioration in the investment climate for small cap mining exploration companies. Amec Foster Wheeler, supported by Knight Piesold Consultants, were engaged to conduct the FS.
Cañariaco Sur Deposit and Quebrada Verde Prospect
The potential exists to discover and delineate additional Resources at the Cañariaco Sur deposit and Quebrada Verde which are located approximately 1.5 kilometres and 3 kilometres south respectively of the Cañariaco Norte Project. Should an economic deposit be delineated at either site, it is possible that development would utilise the proposed Cañariaco Norte Project facilities.
For more information, please visit www.candentecopper.com.
1) See the Cañariaco Project, Lambayeque Department, Peru, NI 43-101 Technical Report on Pre-feasibility Study Progress Report Prepared by AMEC Americas Ltd. for Candente Copper Corporation and dated with an effective date of 18 January 2011, a copy of which is available on www.sedar.com under Candente profile.
2) Anglo Pacific has received conditional approval from the TSX to list the Anglo Pacific shares forming the Share Consideration. In obtaining such conditional approval, the Company has relied on the “Interlist Exemption” contained at section 602.1 of the TSX Company Manual, which provides that the TSX will not apply its standards to certain transactions involving eligible interlisted issuers on a recognised exchange, such as the London Stock Exchange.
Entrée Resources
Entrée Resources Ltd. is a Canadian mining company with a carried joint venture interest on a significant portion of one of the world’s largest copper-gold projects – the Oyu Tolgoi project in Mongolia. Entrée has a 20% carried participating interest in the Entrée/Oyu Tolgoi joint venture, with a 30% interest in all mineralization identified above 560 metres elevation on the Entrée/Oyu Tolgoi joint venture property. More information about Entrée can be found at www.EntreeResourcesLtd.com.
For a full copy of this release please click here

This website is owned and operated by Anglo Pacific Group PLC. When we refer to “Anglo Pacific Group PLC”, the “Company”, “Anglo Pacific” or the “Group”, we mean Anglo Pacific Group PLC and/or one or more or all of its affiliates, as may be applicable.

BY USING THIS WEBSITE, YOU AGREE TO THE FOLLOWING TERMS AND CONDITIONS.

Copyright and trademarks

Certain materials (e.g. graphics, icons, HTML, javascripts, color schemes, multimedia, logos, photographs, copywriting, etc.) that appear in this website are the property of the Group and are protected by copyright. Certain names, graphics, logos, icons, designs, words, titles or phrases on this website may constitute trade names, trademarks or service marks of the Group or other entities. Trademarks may be registered in the United Kingdom and/or in other countries, as applicable. The display of trademarks on pages in this website does not imply that a license of any kind has been granted. Except for non-commercial, personal or educational purposes, where the material is not modified and that copyright or trademark notices are not deleted, materials may not be copied, reproduced, modified, uploaded, posted, transmitted, or distributed in any way without the Group’s prior written approval. Any unauthorized downloading, re-transmission or other copying or modification of trademarks and/or the contents herein may be a violation of applicable law, including trademark and/or copyright law, and could subject the copier to legal action.

Important notice

Certain statements in this website, other than statements of historical fact, are forward-looking statements based on certain assumptions and reflect the Group’s expectations and views of future events. Forward-looking statements are provided for the purposes of assisting the reader in understanding the Group’s financial position and results of operations as at and for the periods ended on certain dates, and to present information about management’s current expectations and plans relating to the future. Readers are cautioned that such forward-looking statements may not be appropriate for other purposes than outlined in this website. These statements may include, without limitation, statements regarding the operations, business, financial condition, expected financial results, cash flow, requirement for and terms of additional financing, performance, prospects, opportunities, priorities, targets, goals, objectives, strategies, growth and outlook of the Group including the outlook for the markets and economies in which the Group operates, costs and timing of acquiring new royalties, mineral reserve and resources estimates, estimates of future production, production costs and revenue, future demand for and prices of precious and base metals and other commodities, for the current fiscal year and subsequent periods. In addition, statements relating to “reserves” or “resources” are forward looking statements, as they involve implied assessment, based on certain estimates and assumptions, that the resources and reserves described can be profitably produced in the future.

Forward-looking statements include statements that are predictive in nature, depend upon or refer to future events or conditions, or include words such as “expects”, “anticipates”, “plans”, “believes”, “estimates”, “seeks”, “intends”, “targets”, “projects”, “forecasts”, or negative versions thereof and other similar expressions, or future or conditional verbs such as “may”, “will”, “should”, “would” and “could”. Forward-looking statements are based upon certain material factors that were applied in drawing a conclusion or making a forecast or projection, including assumptions and analyses made by the Group in light of its experience and perception of historical trends, current conditions and expected future developments, as well as other factors that are believed to be appropriate in the circumstances. The material factors and assumptions upon which such forward-looking statements are based include: the general economy is stable; local governments are stable; interest rates are relatively stable; equity and debt markets continue to provide access to capital; the ongoing operations of the properties underlying the Group’s portfolio of royalties by the owners or operators of such properties in a manner consistent with past practice; the accuracy of reserve and resource estimates, grades, mine life and cash cost estimates; the accuracy of public statements and disclosures made by the owners or operators of such underlying properties; no material adverse change in the market price of the commodities that underlie the Group’s portfolio of royalties and investment interests; no adverse development in respect of any significant property in which the Group holds a royalty or other interest; the successful completion of new development projects; the accuracy of publicly disclosed expectations for the development of underlying properties that are not yet in production; planned expansions or other projects within the timelines anticipated and at anticipated production levels; and title to mineral properties. Forward-looking statements are not guarantees of future performance and involve risks, uncertainties and assumptions, which could cause actual results to differ materially from those anticipated, estimated or intended in the forward-looking statements.By its nature, this information is subject to inherent risks and uncertainties that may be general or specific and which give rise to the possibility that expectations, forecasts, predictions, projections or conclusions will not prove to be accurate; that assumptions may not be correct and that objectives, strategic goals and priorities will not be achieved. A variety of material factors, many of which are beyond the Group’s control, affect the operations, performance and results of the Group, its businesses and investments, and could cause actual results to differ materially from those suggested any forward-looking information. Such risks and uncertainties include, but are not limited to risks noted in the section entitled “Risk Factors” in the Annual Information Form of the Group for the year ended December 31, 2009 (available at www.sedar.com”. If any such risks actually occur, they could materially adversely affect the Group’s business, financial condition or results of operations. Readers are cautioned that the list of factors noted in the section entitled “Risk Factors” in the Annual Information Form of the Group is not exhaustive of the factors that may affect the Group’s forward-looking statements. Readers are also cautioned to consider these and other factors, uncertainties and potential events carefully and not to put undue reliance on forward-looking statements.Although the forward-looking statements contained in this website are based upon what the Group believes are reasonable assumptions, there can be no assurance that actual results will be consistent with these forward-looking statements. The forward-looking statements made in this website relate only to events or information as of the date on which the statements are made and, except as specifically required by law, the Group undertakes no obligation to update or revise publicly any forward-looking statements, whether as a result of new information, future events or otherwise, after the date on which the statements are made or to reflect the occurrence of unanticipated events.The Group’s core strategy focuses on mineral royalties and strategic investments. Mining companies are not typically required and, as a matter of practice, do not normally disclose detailed information to companies which hold a royalty interest or strategic investment in their operations. As a result, this website contains information (including forward-looking statements) contained and derived from publicly available information regarding properties and mining operations owned by third parties. The Group’s management relies upon this public information in its estimates, projections, plans, and analysis. However, the statements (including forward-looking statements) in this website relating to the Group’s investments are generally limited to, and rely upon, information generally available in the public domain, generally without recourse to independent verification or validation or access to either the mining operations in which the Group is invested or the management of those mining operations. Although the Group has no knowledge that would indicate that any such information contained in this website is untrue or incomplete, the Group assumes no responsibility for the accuracy or completeness of such information. No representation or warranty, express or implied, is given to the accuracy of such information.Readers are reminded that Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability. Certain scientific and technical information on this website has been summarized or extracted from certain technical reports, as follows:• scientific and technical information relating to Kestrel Mine in this website is summarized or extracted from “A NI 43-101 Technical Report on Kestrel Coal Mine Royalty, Queensland, Commonwealth of Australia” dated March 2010, prepared by SRK Consulting (UK) Limited, and endorsed by Paul Bright and Dr. Iestyn Humphreys, each of whom is a Corporate Consultant of SRK and each of whom is a “Qualified Person” in accordance with National Instrument 43-101 — Standards of Disclosure for Mineral Projects (“NI 43-101”) and is independent of the Group. This report can be viewed here.• scientific and technical information in this website relating to Trefi Coal Project is summarized or extracted from “Resource Estimate for the Trefi Coal Property” dated 18 March 2010, prepared by Robert J. Morris, Principal Geologist of Moose Mountain Technical Services, and Robert F. Engler, Principal of Moose Mountain Technical Services, each of whom is a “Qualified Person in accordance with NI 43-101 and is independent of the Group. This report can be viewed here.• scientific and technical information in this website relating to Panorama Coal Project is summarized or extracted from “Resource Estimate for the Discovery and Panorama Coal Property” dated 18 March 2010, prepared by Robert J. Morris, Principal Geologist of Moose Mountain Technical Services, and Robert F. Engler, Principal of Moose Mountain Technical Services, each of whom is a “Qualified Person in accordance with NI 43-101 and is independent of the Group. This report can be viewed here.Readers are cautioned not to rely solely on the summaries of such scientific and technical information contained in this website, but should read the above-noted technical reports which are available at SEDAR and on this website, and any future amendments to such reports. Readers are also directed to the cautionary notices and disclaimers contained in such technical reports.Readers should refer to the Annual Information Form of the Group for the year ended December 31, 2009 and other continuous disclosure documents filed by the Group since the date thereof (available at SEDAR) for further information relating to the Group more generally.

Exclusion of liability

THE INFORMATION AND MATERIALS CONTAINED IN THIS WEBSITE ARE PROVIDED “AS IS” WITHOUT ANY EXPRESS OR IMPLIED WARRANTY OF ANY KIND, INCLUDING WARRANTIES OF MERCHANTABILITY, NON-INFRINGEMENT OF INTELLECTUAL PROPERTY, OR FITNESS FOR ANY PARTICULAR PURPOSE. IN NO EVENT SHALL THE GROUP BE LIABLE FOR ANY DAMAGES WHATSOEVER (INCLUDING, WITHOUT LIMITATION, DAMAGES DUE TO LOSS OF PROFITS OR BUSINESS INTERRUPTION) OR DUE TO THE USE OF OR INABILITY TO USE THE INFORMATION OR MATERIALS CONTAINED IN THIS WEBSITE.

In using this website, the reader agrees that the Group shall not be liable for any claims, expenses, damages whatsoever (including indirect, incidental, special, punitive or consequential damages), loss of profits, opportunities or information arising from:

  •  The use of or reliance on information contained in this website;
  •  Any inaccuracy or omission in such information or failure to keep the information current;
  • Use of any third-party websites linked or referred to in this website;
  •  Any delays, inaccuracies or errors in, or in the transmission of, any stock price quotes or historical price data;
  •  Any Internet software used in connection with this website or computer viruses or other destructive programs encountered as
    a result of using this website;
  •  Any other matter connected with this website; even if the Group is made aware of the possibility of such claims, expenses,
    damages or losses.

Although considerable care has been taken in preparing and maintaining the information and materials contained on this website, they are provided on an “as is” basis, without warranty of any kind, either express or implied, with respect to the accuracy or completeness of the information.

Currency of website

The Group updates the information in this website regularly. However, such information is not intended to be a comprehensive review of all matters and developments concerning the Group and the Group cannot guarantee the accuracy, currency or completeness of the information at all times and assumes no responsibility in this regard.

Unless otherwise indicated, all information posted on this website is current only as of the date of the document that contains the information, if indicated, or the date on which the document is posted, whichever is earlier. The Group may at any time make changes to the information in this website without prior notice. Readers are cautioned to always ensure that they are referring to the most current information available in this website.

The Group is not responsible for linked websites

In this website, the Group has provided links and references to several other websites. The Group has no control over information at sites hyperlinked or referred to in this website. These links and references to third-party websites are being provided for the convenience of the reader only and the Group does not endorse and is not responsible or liable for the content, nature or reliability of any linked or referenced website, or any link contained in a linked or referenced website. The Group takes no responsibility for monitoring, updating, supplementing or correcting any information on any linked or referenced website and makes no representation or warranties regarding such information. Please be aware that in linking or going to these outside websites, you are leaving the Group website and the Group accepts no responsibilities for the content of these linked or referenced websites.

The Group is not responsible for stock quotes

All quotes are delayed at least 15 minutes unless otherwise stated. All stock quotes and historical stock price data are provided by third-party providers and are provided for informational purposes only, and are not intended for trading purposes. Readers who are contemplating trading in the securities of the Anglo Pacific Group PLC are strongly advised to seek independent professional advice before making any investment decision. The Group makes no representation or warranty regarding the accuracy or completeness of any such stock price quotes or historical stock price data and has not taken any steps to verify the adequacy, accuracy or completeness of the information provided in this website and, under no circumstances will the Group be liable for ay inaccuracies, or omissions in any such information or data, any delays or errors in the transmission thereof, or any loss or direct, indirect, incidental, special or consequential damages caused by reliance on this information or data, or the risks arising from the stock market.

The Group is not responsible for internet software or viruses

Due to technical difficulties inherent in the Internet, Internet software or transmission problems could produce inaccurate or incomplete copies of information contained in this website. Computer viruses or other destructive programs may also be inadvertently downloaded from this website. The Group shall not be liable for Internet software, computer viruses or destructive programs and recommends that you install appropriate anti-virus or other protective software.

Website is provided as a service only

This website is not intended as a solicitation or offering of securities in any jurisdiction and the information contained herein in no way should be construed or interpreted as such. No securities commission or other regulatory authority in the United Kingdom, Canada or any other country or jurisdiction has in any way passed upon this information and no representation or warranty is made by the Group to that effect. The information in this website is not intended to modify, qualify, supplement or amend information disclosed under corporate and securities legislation of any jurisdiction applicable to the Group and should not be used for the purpose of making investment decisions concerning securities of Anglo Pacific Group PLC. Printed copies of public disclosure documents may be obtained upon written request from Jason Gray, Company Secretary, 1 Savile Row, London, W1S 3JR, United Kingdom.

Privacy statement

This website is operated by Anglo Pacific Group PLC (“we”, “us” or “Anglo Pacific”) and we are a controller for the purposes of the EU General Data Protection Regulation 2016/679. This means that we are responsible for, and control the processing of, the personal information you provide to us when using this website in accordance with this privacy policy.

Anglo Pacific understands that investors care about the use and storage of their personal information and we value your trust in allowing us to do this in a careful and sensible manner. We have created this privacy policy statement in order to demonstrate our commitment to your privacy, rights and freedoms.The Group does collect and maintain statistics relating to the number of visits to this website, the types of browsers used and the Internet Protocol Address of the originator. This information is used only for internal purposes.If you have concerns relating to the privacy or confidentiality of this website, please contact Jason Gray, Group Financial Controller, 1 Savile Row, London W1S 3JR, United Kingdom, at the Group.

This field is required.

Continue

I have read the above and do not wish to access the website.